The award of a public service concession for the design, manufacture, delivery, installation, operation, training, maintenance and periodic upgrading of an automated single dose-system and smart cabinets for Pharmaceutical … – (DIALOGUE STAGE)

Ref No: PML/05/2015

The award of a public service concession for the design, manufacture, delivery, installation, operation, training, maintenance and periodic upgrading of an automated single dose-system and smart cabinets for Pharmaceutical, Medical Materials and Surgical Devices for E-Prescribing and Medicines Administration (ePMA) to the Department of Health (Malta)

Prequalification Questionnaire (PQQ)
Clarification Request Replies
Reference to Clarifications
Summary of Prequalification Questionnaires Received
Late Submission
Process Status Notification 8th February 2016
Notice – Shortlisted Candidates following PQQ Submission Evaluation
Notice – Initial Solutions Submissions / Reply to ITPD – 3rd May 2016
PML_052015_Updated Process timetable 27052016
PML_052015_Conclusion of Competitive Dialogue Stage 2A
PML_052015_Change in Timetable Stage 2B
PML_052015_Change in Timetable Stage 2B as at 11th Aug 2016
PML_05_2015 Notification re Consortia Composition – 1st September 2016
PML_052015_Notification of suspension of timetable
Projects Malta Information Memorandum
Summary of detailed solutions received
PML_05_2015_Change in Timetable Stage 2B as at 20th March 2017
PML_05_2015_Change in Timetable Stage 2B as at 9th May 2017
Stage 3 – Updated Process Timetable – 18-09-2017
Project Malta Concession Contract 20170928 (execution)
Project Malta Concession Contract Schedules (execution)2
Robotics BAFO 20170918 (execution)
Minutes-of-Clarification-Meeting-of-the-10th-October-2017
Stage-3-Updated-Process-Timetable-01-11-2017
Clarifications reply 11.4.2017
Annex-A-Schedule-I
Annex-A-Schedule-II
Annex-B-No-of-Invoices-Received-from-Suppliers-and-no-of-Invoices-issued-to-Ent
Annex-C-Delivery-points-Site-Visit-entities
Annex-C-Delivery-points-MDH
Annex-D-Health-Virtualisation-Platform-High-Level-Blueprint
Annex-D-Federated-authentication-and-Web-Single-Sign
Annex-E-Operational-Document-Roles-and-Responsilbilties
Annex-F-Customer-Demand-ALL-ENTITIES
Clarifications-for-PML_05_2015-16_11_2017-Final
Saving Formula Note
Last-clarifications-30_11_2017-SPLA-Swisslog-Final-29_11_2017
Annex-4-Rev1-­-Financial-Offer-Form-Update
Clarifications-questions-and-answers-put-forward-on-the-30.11.2018
Clarification-Meeting-12th-December-2017-Final
Annex-4-Rev2-­-Financial-Offer-Form-Update
Robotics-BAFO-Submissions